임직원 사업실적

가치를 창조하는 기업 YUSUNG ENG. & CONST. CO., LTD

국내


No. 공사내용 발주처/원도급사 기간
34 No.2 HOU Project VDU Mech. & Piping (Field) Works GS Caltex Corporation / GS Eng. & Const. Co., Ltd. 2006. 07 ~
2007. 12
33 No.2 HOU Project LOP/SRU Area Tank Works GS Caltex Corporation / GS Eng. & Const. Co., Ltd. 2006. 06 ~
2007. 10
32 #1 HVL/# 1 HMP T/A Pipe & Valve Replacement Works and others 3 project S-Oil Refining Co. 2006. 05 ~
2006. 09
31 KES2-Project Breyor Equipment Installation Works Dongwoo Fine-Chem Co., Ltd. / eTec E&C Co., Ltd. 2006. 03 ~
2006. 05
30 YNCC Extension Project Compressor Area Mech./Piping/Stl.Str Work Yeochun NCC Co., Ltd / Daelim Industrial Co., Ltd. 2006. 03 ~
2007. 02
29 LG EDC & VCM Tank Project Storage Facility Extension Project LG Chemical Co., / Hyundai Heavy Industrial Co., Ltd. 2006. 03 ~
2006. 12
28 Storage Tank No.1~19 Repair Works S-Oil Refining Co. 2006. 02 ~
2007. 02
27 VCM CA/EDC Naclo3 System Project and other 1 project LG Chemical Co., 2006. 02 ~
2007. 02
26 2005 T/A RTS Work and others 2 projects S-Oil Refining Co. 2005. 05 ~
2005. 07
25 DCC DeNOx-Project Mech. & Piping, Insulation Works DC Chemical Co., Ltd. / eTec E&C Limited 2005. 04 ~
2005. 06
24 10PD Project Stl/Str & Piping Works S-Oil Refining Co. 2005. 04 ~
2005. 10
23 KN Project Mechanical Install. & Piping Work DC Chemical Co., Ltd. / eTec E&C Limited 2005. 03 ~
2005. 08
22 KES 1 - Project Extruder Package Installation Work Dongwoo Optical Materials Co., Ltd. / eTec E&C Limited 2005. 02 ~
2005. 06
21 Incheon Depot Project Tank Repair Work and others 1 Project S-Oil Refining Co. 2005. 02 ~
2005. 04
20 No.2 CDU Desalted Effluent Water Project and others 7 project S-Oil Refining Co. 2005. 01 ~
2005. 12
19 N-PROJECT Mechanical & Piping Work Hanwha Corp. / eTec E&C Limited 2004. 03 ~
2004. 12
18 KPA(Ⅲ) PROJECT Off-Site Mechanical Works Kumho P&B Chemical Co. / Kumho Eng. & Const. Co., Ltd. 2004. 01 ~
2005. 05
17 Incheon Depot Project Tank Repair Work and others 1 Project S-Oil Refining Co. 2003. 08 ~
2003. 12
16 Capro Wastewater Treatment Expansion Project Mechanical Works Capro Corporation / Kolon Eng. & Const. Co. 2003. 07 ~
2004. 02
15 Caprolactam Tank Farm Expansion Project Mechanical Works Capro Corporation / Kolon Eng. & Const. Co. 2003. 07 ~
2004. 02
14 Expansion of MDI Production Train Korea Basf Co. / Hanwha E&C Corp. 2003. 03 ~
2004. 05
13 CMS HGBL Pilot Project Equipment Installation and Piping Work SK Corporation / eTec E&C Limited 2002. 12 ~
2003. 04
12 CMS Batch Pilot Project Equipment Installation and Piping Work SK Corporation / eTec E&C Limited 2002. 11 ~
2003. 05
11 SPC Energy Project Stl./Str., Mechanical & Piping Erection Works Samsung Petrochemical Co., Ltd. / Samsung Corporation 2002. 07 ~
2002. 12
10 SPRINT Project Equipment Installation and Piping Work for ISBL Rhodia Polyamide Co., Ltd. / eTec E&C Limited 2002. 02 ~
2003. 03
9 Liquid & Solid Formulation Project Bayer Cropscience Ltd. 2002. 01 ~
2002. 12
8 SPRINT Project 1st Shutdown Tie-in & Under Ground Piping Work Rhodia Polyamide Co., Ltd. / eTec E&C Limited 2001. 09 ~
2001. 07
7 NHC Project A/G Piping, Equip. Erection, Stl/Str, Painting Insulation, U/G Piping Work S-Oil Refining Co. 2001. 07 ~
2002. 10
6 BASF ABS-Ⅱ Project Piping & Equipment Erection Hyosung BASF Co. / Hyosung Heavy Ind. Co. 1997. 04 ~
1997. 10
5 #2 PX IBL Project U/G & A/G Piping Erection Work Yukong / S K E C 1996. 03 ~
1997. 03
4 Naptha Tank Fab. & Erection 2 Set x 150,000 BBL FRT Civil Ssangyong Oil Refining Co. 1989. 10 ~
1990. 07
3 NUP (New Utility Project) Piping and Storage Tanks Ssangyong Oil Refining Co. 1989. 07 ~
1989. 12
2 NRP (New Reformer Project) 2 x 90,000 BBL FRT / 2 x 60,000 Yukong / S K E C 1989. 06 ~
1989. 08
1 Oil Storage Tanks 3 x 52,000 BBL CRT / 2 x 30,000 BBL CRT Ssangyong Oil Refining Co. 1988. 07 ~
1989. 11